5.1 How to pre-install - general procedure
1. Prepare the substation for the equipments. See § 5.2.
2. Prepare the lightning protection. See § 5.3.
3. Plan a power supply for each equipment. See § 5.4.
4. Plan the cables and the lay-out of the cables. See § 5.5.
5.2 Prepare substation
5.2.1 Procedure
1. Make sure that the substation complies with the general substation specifications. See § 5.2.2.
2. Make sure that sufficient heat dissipation is present. See § 5.2.3.
3. Make sure that sufficient ventilation is present. See § 5.2.4.
4. Make sure that the substation layout meets the minimum clearance specifications. See § 7.6.
5. Install an external fuse. See § 5.2.5.
6. Make sure that the circuit breakers are of the correct type. See § 5.2.6.
7. Install the separate disconnection devices. See § 5.2.7.
WARNING
Make sure that the supply voltage of the equipment is in accordance with the local supply
voltage.
Содержание CRE 10
Страница 1: ...A 07 370e Edition 2 0 Installation Manual Constant Current Regulator Type CRE ...
Страница 14: ...14 A 07 370e Edition 2 0 Safety ...
Страница 44: ...44 A 07 370e Edition 2 0 Inspection and transport ...
Страница 64: ...64 A 07 370e Edition 2 0 Installation ...
Страница 85: ...A 07 370e Edition 2 0 85 Technical data ...
Страница 86: ...adbsafegate com ...