Step 2: Test of high pressure units and high pressure pumps
Control box
Hold rotary switch for “High
pressure pump 1” in position „M“
for ca.20 seconds.
Check the following:
■
Solenoid valve must provide
drinking water into filling device
(3)
■
High pressure spray head must
rotate and spray water (4)
■
Return rotary switch to position
“A” after the above mentioned
10 seconds
Repeat the process for “High
pressure pump 2”
3. Drinking water flows through
solenoid valve
4. Operation of high pressure
spray head
Step 3: Test of filling device
Control box
Hold rotary switch for “Solenoid
valve” in position „M“ for ca. 10
seconds.
Check the following:
■
Solenoid valve must provide
drinking water into filling device
(5)
■
Return rotary switch to position
“A” after the above mentioned
10 seconds