
Installation
62/ 80
LipuJet-P-OB / -OD, LipuJet-P-OA / -OAP
ATTENTION
The disposal line must a least have DN 65 (PN 6 or PN 10) and must be
laid with gradient to the separator. In order to avoid noise transmission and vibrations,
compensators have to be used.
The maximum length of the disposal line has to be determined in accordance with the
performance of the disposal pump.
4.6 Filling device (LipuJet-P-OA, -OAP)
The filling device feeds the high pressure
pumps with drinking water and fills the
separator with water after the disposal
of the contents and the cleaning of the
separator body.
A fresh water line has to be connected via
the available R ¾” connection.
The fresh water line has to be equipped
with a ball valve. A required minimum
flow rate quantity of 30 l/min must be
guaranteed.
Water connection of filling device with ball
valve (white square)
For operation of high pressure pumps and re-filling of separator body after emptying
Please note
: filling device automatically operates daily for three seconds to maintain
water seal in foul air trap