For Your Safety
47/ 80
LipuJet-P-OB / -OD, LipuJet-P-OA / -OAP
EN
Before any work is carried out on the electrical equipment in a separator, it is essential for
the following measures to be implemented in the following order:
1. All-pole disconnection (switching off the main plug or pulling out the mains plug)
2. Securing against accidental switching on.
3. Checking that the system is not connected to the circuit.
Correct intended use
The separator plant is intended exclusively for separation of saponifiable oils and fats of
vegetable and animal origin. Further use is not regarded as correct intended use and the
manufacturer is not liable for any damage resulting from improper use; the risk is borne by
the operator.
The correct intended use also includes adherence to assembly, commissioning, operating
and servicing conditions set out by the manufacturer. For safety reasons, conversion works
at plant are not permitted.
The correct intended use also includes:
■
Observe national laws and regulations
■
Adhere to inspection and maintenance information.
Endangering in the case of non-observance
Non-observance of safety notes, regulations and manufacturers information may lead to
endangering persons as well as the environment and plant.
No damage claims are accepted in the case of non-observance of safety notes.
Delayed installation
If it is already known or expected during installation that commissioning of plant will be
carried out only after a protracted period, following measures should be taken to protect
(conserve) the plant:
■
Protect plant from damp and pollution
■
Move function parts from time to time to prevent seizing
In case, commissioning is carried out more than 1 year after installation had taken place,
plant should be checked by ACO Haustechnik - after-sales service (at a charge).
Stopping and re-commissioning
Works at the plant may basically only be performed during stillstand periods. The process
sequence to stop plant, described in the operation manual, must be adhered to. Directly
following completion of works, all safety and protection devices must be re-installed
or set into function. Prior to re-commissioning, all points mentioned in section “initial
commissioning” have to be observed.