
Operation
66/ 80
LipuJet-P-OB / -OD, LipuJet-P-OA / -OAP
Position of shut-off valves (LipuJet-
P-OAP):
ATTENTION
The shut-off valve has to be
open.
Only for maintenance purposes the valve
has to be closed manually.
5.2 Commissioning (LipuJet-P-OA, -OAP)
Step 1: Oil containers of high-pressure pumps
Ventilate both oil containers
of high-pressure pumps and
check oil levels
■
Permanent position of rotating
switch has to be “Ein” (1).
■
In order to ventilate the
oil containers, the rubber
projecting end of the caps must
be cut off. If needed, please
use oil type SAE 90 only for
refilling (2).
1. Turn rotating switch to position
„EIN“
2. Cut of rubber projecting end on
cap