3 INSTALLATION
3.1 Foundation
To upgrade the operation efficiency and accuracy of precision machining, a
proper foundation is required.
It is recommended to locate the machine in a place away and without the
influence of damping, chemical gas or trembling. The machine body is not
allowed to be exposed to sunshine or rain. Please be sure not to install the
machine adjacent to planning machine, milling machine molding or punching
machine. Otherwise, it will result in poor performance.
A distance of at least 20” (500mm) is required form machine to wall and objects
or between machines to ensure easy preparation, cleaning and maintenance of
machine as well as easy opening of the door of electric cabinet.
With special torque-resistant capability at the machine base, this machine
requires no particular foundation. Just provide 6” (150mm) thick of concrete
on the floor and leave space for component for leveling.
Do not use wood foundation which with nature of unsuitability may cause the
machine to move gradually.
Install the machine on the first or second floor. Take the stress of ceiling and
foundation into careful consideration to see if machine load can be offset.
When positioning the machine, remove the fixing screws at the left / right door
Содержание ATL 1820E
Страница 5: ...1 SAFETY INSTRUCTIONS ...
Страница 22: ...Page 1 17 ...
Страница 24: ...2 MACHINE SPECIFICATIONS ...
Страница 25: ...Page 2 1 2 MACHINE SPECIFICATIONS 2 1 Dimensional drawing ...
Страница 27: ...Page 2 3 2 1 2 Chip Conveyor ...
Страница 31: ...3 INSTALLATION ...
Страница 34: ...3 1 2 Layout floor plan Following is a top view drawing ...
Страница 43: ...4 MAINTENANCE ...
Страница 55: ...5 CHUCK ...
Страница 64: ...Page 7 3 7 1 HEADSTOCK 1 HEADSTOCK _ 18 SPINDLE BORE 58mm 2 ...
Страница 65: ...Page 7 4 18 SPINDLE BORE 58mm 2 ...
Страница 69: ...Page 7 8 7 2 BED Z AXIS TRANSMISSION ...
Страница 71: ...Page 7 10 7 3 CARRIAGE CROSS SLIDE ...
Страница 74: ...Page 7 13 7 4 TAILSTOCK MANUAL TAILSTOCK _ 18 ...