Page 2-6
2.3 Check list
2.3.1Check list for operation
ITEM
JOB
DESCRIPTION NO.
01
Read through operating manual thoroughly
02
Read through all instruction manual thoroughly
03
Lifting moving machine
04
Installing machine
05
Leveling machine
06
Lubricating instruction
07
Checking electrical circuit connection
08
Main switch and button ‘’ON’’
09
Press emergency stop button to stop machine
10
Learn safety rules
11
Simple trouble shooting
12
Maintenance
2.3.2 Check list for maintenance
ITEM
JOB
Interval
01
Clean machine (do not use air compressor)
Weekly
02
Check electrical circuit connection
Every time before operation
03
Replace coolant ant clean coolant tank
3 months
04
Clean motor
Annually
05
Check Slide (x axis)
Annually
06
Check Slide (z axis)
Semi-annually
07
Check Spindle tip
Annually
08
Check Automatic lubrication unit
Weekly
09
Add grease
Weekly
Содержание ATL 1820E
Страница 5: ...1 SAFETY INSTRUCTIONS ...
Страница 22: ...Page 1 17 ...
Страница 24: ...2 MACHINE SPECIFICATIONS ...
Страница 25: ...Page 2 1 2 MACHINE SPECIFICATIONS 2 1 Dimensional drawing ...
Страница 27: ...Page 2 3 2 1 2 Chip Conveyor ...
Страница 31: ...3 INSTALLATION ...
Страница 34: ...3 1 2 Layout floor plan Following is a top view drawing ...
Страница 43: ...4 MAINTENANCE ...
Страница 55: ...5 CHUCK ...
Страница 64: ...Page 7 3 7 1 HEADSTOCK 1 HEADSTOCK _ 18 SPINDLE BORE 58mm 2 ...
Страница 65: ...Page 7 4 18 SPINDLE BORE 58mm 2 ...
Страница 69: ...Page 7 8 7 2 BED Z AXIS TRANSMISSION ...
Страница 71: ...Page 7 10 7 3 CARRIAGE CROSS SLIDE ...
Страница 74: ...Page 7 13 7 4 TAILSTOCK MANUAL TAILSTOCK _ 18 ...