| Installation –
Commissioning the wallbox
16
Now conduct all locally required checks and testing of the wallbox and its electrical installation. These
include the following tests:
Effectiveness of protective earth conductor connections
Insulation resistance
Loop impedance
Voltage drop
RCCB tripping current and tripping time
Rotating field testing
as well as additional tests according to local regulations.
3
Replace the electronic components cover onto the
housing base and fix it into place with the screw
you removed in
Step 8
fixing the wallbox in place" on page 11.
4
Hook the housing cover onto the upper edge of
the housing base and lock it using the housing
cover key.
The installation of the Wallbox eMH2 is now complete and the wallbox is ready for operation.