| Installation –
Installation site requirements
8
Installation
It is recommended to have the entire installation of the wallbox carried out by a qualified specialist electrical con-
tractor.
Electrical installation, as well as final testing and certification for operation must be carried out by a
qualified specialist electrical contractor, who, on the basis of their specialist training and experience,
as well as their knowledge of the relevant standards, is able to assess and carry out the working steps
described in this manual and recognise potential hazards.
Installation site requirements
The installation site must be freely accessible.
The mounting surface must be level and solid.
The mounting surface must measure at least
437 x 328 mm (height x width).
328 mm
437 mm
The installation height should be between 120
and 140 cm (ground to bottom edge of housing).
Minimum distances to other technical installa-
tions must be observed.
A minimum distance of 50 cm is recommended.
120
to
140 cm
Содержание WALLBOX eMH2 EN
Страница 1: ...Article No 0301772_EN_a EN WALLBOX eMH2 Installation and Operating manual...
Страница 35: ...Service 35...