Installation –
Electrical connection of the wallbox |
13
Proceed as follows to connect the power supply cable inside the wallbox:
1
Cut the supply cable to the required length with
the pliers.
y
For wiring up group installations (see next
section), you must also cut the data cables to
the required length.
2
Insert the individual conductors of the power
supply cable into the respective terminals of the
RCCB and tighten them using the screwdriver
(torque: 2.5 to 3 Nm).
y
End ferrules must be fitted on flexible
conductors.
y
Operate the spring-loaded mechanism of the
PE terminal and attach the protective earth
conductor.
y
Use the connection patterns listed below to
allocate the individual conductors.
Connection pattern for 3-phase TN system
Designation
Conductor color
Marks for
Phase 1 current-carrying conductor
Brown
5
– L1
Phase 2 current-carrying conductor
Black
3
– L2
Phase 3 current-carrying conductor
Gray
1
– L3
Neutral
Blue
N
Protective earth
Green-Yellow
PE
Connection pattern for 1-phase TN system
Designation
Conductor color
Marks for
Phase 1 current-carrying conductor
Brown
5
– L1
Neutral
Blue
N
Protective earth
Green-Yellow
PE
Please note that the colour-coding convention used above is not internationally standardised.
Please ensure that the conductors that are pre-fixed to the RCCB terminals remain attached correctly
after connecting the power supply cable.
If desired, the 3-phase Wallbox eMH2 model variant can also be connected and operated on a single
phase at terminal
5
–
L1
: However, in this case the rated output for the wallbox will not be achieved.
The electronic components of your wallbox will be damaged if a voltage above 250 V is applied between
the
5
–
L1
current-carrying conductor and the neutral conductor
!
Содержание WALLBOX eMH2 EN