Contents |
III
Contents
Contact II
Additional technical information
Introduction to the Wallbox eM4 Twin
The Wallbox eM4 Twin at a glance
Information displayed in the energy meter
Forming charging groups and network topologies
External load shedding in accordance with VDE AR-N 4100
Components included with the wallbox
Installation of the Wallbox eM4 Twin
Installation site requirements
Tools and accessories required
Inserting the power and data cables
Preparing the installation site
Preparing and fixing the wallbox in place
Electrical connection of the wallbox
Phase rotation within a charging group
Conversion from 3- to 1-phase operation of the Wallbox eM4 Twin
Connecting a control cable in accordance with VDE AR-N 4100
Preparing and installing the LTE USB stick
Configuring the Wallbox eM4 Twin
Availability of the ABL Configuration App
Setting up communication via the ABL Configuration App
Onboarding – Configuration of an Extender wallbox for stand-alone operation
Onboarding – Configuring the Controller / Extender operating mode
Control Board settings and reboarding
Description of the charging process
Error resolution and maintenance
Support via the ABL Support page
Quick solution for general problems
Taking the Wallbox eM4 Twin out of operation
Replacing the lever lock in an RCCB flap
Replacing the charging socket flap
Resetting the wallbox and restoring to factory settings