Wallbox eM4 Twin start-up |
37
The mechanical and electrical installation of the Wallbox eM4 Twin is now complete and the wallbox can be set up
via the
ABL Configuration App
(see next chapter starting on page 38).
NOTE
Removing the protective films
The housing cover and the windows of the two energy meters of the Wallbox eM4 Twin are covered with films
to protect them during transport. To allow better readability of the HMI and the meter displays and to avoid mi-
croplastic, it is recommended that you remove the protective films from the housing once the installation is com-
plete and dispose of them properly.
WARNING!
Carrying out all necessary tests for start-up
After setting up via the
ABL Configuration App
, you must carry out all the tests prescribed for the installation
site on the wallbox and the electrical installation to complete the start-up. These include the following tests:
Effectiveness of protective earth conductor connections
Insulation resistance
Loop impedance
Voltage drop
RCCB tripping current and tripping time
Rotating field testing
as well as additional tests according to local regulations.
J
Use an installation tester and a vehicle simulation
adapter to conduct the prescribed tests.
N PE
L1 L2 L3
J
Use a vehicle simulation adapter to conduct a
functional test of the charging function.
N PE
L1 L2 L3