Installation site requirements |
23
Installation of the Wallbox eM4 Twin
The entire installation of the Wallbox eM4 Twin must be carried out by a qualified specialist electrical contractor.
DANGER!
Dangerous electrical currents
Electrical installation, as well as final testing and certification for operation must be carried out by a qualified
specialist electrical contractor, who, on the basis of their specialist training and experience, as well as their
knowledge of the relevant standards, is able to assess and carry out the working steps described in this manual
and recognise potential hazards.
Installation site requirements
The Wallbox eM4 Twin is suitable for installation in enclosed spaces such as garages as well as in outdoor areas
such as company car parks. Please note, however, that the permissible ambient conditions (see "Technical specifica-
tions" on page 62) must be adhered to in order to guarantee the functionality of the wallbox at all times.
The installation site must be freely accessible.
Minimum distances to other technical installations must be
observed. A minimum distance of 50 cm is recommended.
min.
50 cm
The installation surface must be level and sufficiently
load-bearing (minimum: weight of the wallbox plus two charg-
ing cables).
90°
90°
The mounting surface must measure at least 516 × 428 mm
(height x width). Also take into account the couplings of the
charging cables.
428 mm
516 mm