| Installation of the Wallbox eM4 Twin
24
The installation height should be between 120 and 140 cm
(ground to bottom edge of housing).
Ideally, the installation location should already provide a fused
connection to the electricity grid. Otherwise, a separate power
supply cable with fuse protection must be installed.
In order to operate wired group installations, suitable data
cables must also be installed in the installation location (see
"Data cable recommendations" on page 65, "Inserting the
power and data cables" on page 26 as well as "Data cable
connections" on page 33).
WARNING!
Maximum length of data and control cable
Please note that the length of the data and control cables from the tapping point (router, switch, ripple control
receiver, VDE-FNN control box, etc.) must not exceed 30 metres!
Tools and accessories required
For mechanical installation, you will need the following components included with the wallbox:
Installation rail, 1 pc.
TX30 wafer head screw, 6 × 140 mm,
2 pcs.
TX30 plug screw, 6 × 60 mm, 2 pcs.
TX30 half-round head screw,
6 × 60 mm, 2 pcs.
Wall plugs 8 × 50 mm, 4 pcs.
Insulating cap, 4 pcs.
Key, 2 pcs.
Drilling template, 1 pc.
8
160
270
421
135
25
80
EXT. CONTROL
DATA
EXT. CONTROL
DATA
230 / 400 V
230 / 400 V
230 / 400 V
DATA
EXT. CONTROL
Front
B
A
C
1
0
1
0
EXT. CONTROL
130 mm
230 / 400 V
130 mm
B
A
C
DATA
170 mm
1
3
4
2
Albert-Büttner-Straße 11
D-91207 Lauf / Pegnitz
Tel. +49 (0) 9123 188-0
Fax +49 (0) 9123 188-188
[email protected]
www.ablmobility.de
Folding ferrite with key, 1 pc.