BUSCH-/ABB-SECURE@HOME
2CSM600727D0901
62/74
12.8
System test
The entire system is tested at the end of the installation and then regularly, at least once
every 6 months, to ensure that all devices and functions are operating correctly. It is also
possible to test a single subset, or a select number of subsets, to check that they are working
properly. Partial testing is useful in the event of limited modifications to the system that only
affect one device or one function.
When using the Test system function, the system may be inactive for 10 minutes, after which
it returns to normal functioning. Each time a test is performed, e.g. a detector sends a
response signal to the central unit, the countdown is reset to 10 minutes.
System testing occurs at a reduced level of 6 dB, as required under the EN50131-5-3 standard.
To test the alarm system:
1.
Log in and go to the Test System screen.
2.
Press OK.
Select the subsystem that you wish to test, and enter the corresponding number. If
the subsystem does not contain devices, the selection will be ignored.
3.
Based on the subsystem selected, new windows will open and it may be necessary to
perform actions to activate the relevant devices.
Sensors
After selecting 1 Sensors as a subsystem, select the zone and activate the various
detectors as appropriate, e.g. by moving past IR detectors, opening and closing
doors and windows for magnetic contacts, spilling water for flooding detectors etc.
All of the possible detectors are listed for each zone, together with the signal
strength upon receipt, indicated using three bars, as shown in the figure.
System test
1 Sensors
2 External sirens
3 Contacts
4 GSM
List of devices
1FA123341
2FB238B45