![ABB Relion REQ650 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/abb/relion-req650/relion-req650_commissioning-manual_3400279037.webp)
IEC13000062-1-en.vsd
IEC13000062 V1 EN
Figure 8:
Select: Use the following IP address
7. Close all open windows and start PCM600.
Setting up the PC to access the IED via a network
This task depends on the used LAN/WAN network.
The PC and IED must belong to the same subnetwork for this set-up to
work.
3.6
Writing an application configuration to the IED
Ensure that the IED includes the correct application configuration
according to project specifications.
The application configuration is created using PCM600 and then written to the IED.
Establish a connection between PCM600 and the IED when an application configuration
must be written to the IED.
1MRK 505 293-UUS A
Section 3
Starting up
29
Commissioning manual