1.
Apply a single-phase voltage 100%
GblBaseSelBus
to the U-Bus, and a single-
phase voltage 30%
GblBaseSelLine
to the U-Line.
2.
Check that the AUTOENOK and MANENOK outputs are activated after set
tAutoEnerg
respectively
tManEnerg
.
3.
Increase the U-Line to 60%
GblBaseSelLine
and U-Bus to be equal to 100%
GblBaseSelBus
. The outputs should not be activated.
4.
The test can be repeated with different values on the U-Bus and the U-Line.
Testing the dead bus live line (DBLL)
The test should verify that the energizing check function operates for a low voltage on
the U-Bus and for a high voltage on the U-Line. This corresponds to an energizing of
a dead bus to a live line.
1.
Verify the settings
AutoEnerg
or
ManEnerg
to be
DBLL
.
2.
Apply a single-phase voltage of 30%
GblBaseSelBus
to the U-Bus and a single-
phase voltage of 100%
GblBaseSelLine
to the U-Line.
3.
Check that the AUTOENOK and MANENOK outputs are activated after set
tAutoEnerg
respectively
tManEnerg
.
4.
Decrease the U-Line to 60%
GblBaseSelLine
and keep the U-Bus equal to 30%
GblBaseSelBus
. The outputs should not be activated.
5.
The test can be repeated with different values on the U-Bus and the U-Line.
Testing both directions (DLLB or DBLL)
1.
Verify the local HMI settings
AutoEnerg
or
ManEnerg
to be
Both
.
2.
Apply a single-phase voltage of 30%
GblBaseSelLine
to the U-Line and a single-
phase voltage of 100%
GblBaseSelBus
to the U-Bus.
3.
Check that the AUTOENOK and MANENOK outputs are activated after set
tAutoEnerg
respectively
tManEnerg
.
4.
Change the connection so that the U-Line is equal to100%
GblBaseSelLine
and
the U-Bus is equal to 30%
GblBaseSelBus
. The outputs should still be activated.
5.
The test can be repeated with different values on the U-Bus and the U-Line.
Testing the dead bus dead line (DBDL)
The test should verify that the energizing check function operates for a low voltage on
both the U-Bus and the U-Line, that is, closing of the breaker in a non-energized
system. Test is valid only when this function is used.
1.
Verify the local HMI setting
AutoEnerg
to be
Off
and
ManEnerg
to be
DBLL
.
2.
Set the parameter
ManEnergDBDL
to
On
.
3.
Apply a single-phase voltage of 30%
GblBaseSelBus
to the U-Bus and a single-
phase voltage of 30%
GblBaseSelLine
to the U-Line.
Section 12
1MRK502053-UEN B
Testing functionality by secondary injection
208
Generator protection REG670 2.0 IEC
Commissioning manual
Содержание REG670 2.0 IEC
Страница 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Страница 2: ......
Страница 16: ...10 ...
Страница 30: ...24 ...
Страница 58: ...52 ...
Страница 62: ...56 ...
Страница 76: ...70 ...
Страница 90: ...84 ...
Страница 94: ...88 ...
Страница 108: ...102 ...
Страница 246: ...240 ...
Страница 252: ...246 ...
Страница 267: ...261 ...