P1
P3
P4
X
R
LineAngle
Z1Fwd
Z1Rev
P2
IEC11000312-2-en.vsd
IEC11000312 V2 EN
Figure 40:
Proposed four test points for phase-to-phase fault
Where,
Z1Fwd
is the forward positive sequence impedance setting for zone 1
Z1Rev
is the reverse positive sequence impedance setting for zone 1
LineAngle
is the Impedance angle for phase-to-phase fault in degrees
Test points
X
R
P1
Z1Fwd · sin(LineAngle)
Z1Fwd · cos(LineAngle)
P2
((
Z1Fwd -Z1Rev / 2) · sin(LineAngle))
Z1Fwd / 2 · (1 + cos(LineAngle) + Z1Rev /
2 · (1 – cos(
LineAngle))
P3
((
Z1Fwd -Z1Rev / 2) · sin(LineAngle))
-
Z1Fwd / 2 · (1 – cos(LineAngle) + Z1Rev /
2 · (1 + cos(
LineAngle))
P4
-
Z1Rev · sinLineAngle
-
Z1Rev · cos(LineAngle)
Change the magnitude and angle of phase-to-phase voltage, to achieve impedances at
test points P1, P2, P3 and P4. For each test point, observe that the output signals,
START and STZ1 are activated where x refers to the actual phase to be tested. After
the operate time delay for the zone 1 has elapsed, the signals TRIP and TRZ1 shall be
activated.
To verify zone 2 and zone 3 mho characteristic, at least two points must be tested.
1MRK502053-UEN B
Section 12
Testing functionality by secondary injection
Generator protection REG670 2.0 IEC
143
Commissioning manual
Содержание REG670 2.0 IEC
Страница 1: ...Relion 670 series Generator protection REG670 2 0 IEC Commissioning manual ...
Страница 2: ......
Страница 16: ...10 ...
Страница 30: ...24 ...
Страница 58: ...52 ...
Страница 62: ...56 ...
Страница 76: ...70 ...
Страница 90: ...84 ...
Страница 94: ...88 ...
Страница 108: ...102 ...
Страница 246: ...240 ...
Страница 252: ...246 ...
Страница 267: ...261 ...