Removing the process hub
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
Take out the process hub.
CAUTION
Be aware of the cabling that is attached to the
cover! The cover can not be removed completely
until the connectors are disconnected, as shown
in following steps.
2
Removing the outer arm cable ferrule and bracket
Note
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx2300000496
Remove the screws on the bracket to the cable
ferrule to release the cable ferrule with cable.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
2
xx2300000497
Remove the screws on the bracket.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
3
Continues on next page
366
Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.7 Replacing the cable arm
Continued
Содержание IRB 930
Страница 1: ...ROBOTICS Product manual IRB 930 ...
Страница 2: ...Trace back information Workspace 23B version a11 Checked in 2023 06 20 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 78: ...This page is intentionally left blank ...
Страница 600: ...This page is intentionally left blank ...
Страница 604: ......
Страница 605: ......