Note
Action
Tightening torque: 6 Nm ±10%
Tighten the motor flange screws when the timing
belt meets the requirement.
5
Refitting the cable ferrule and bracket in the outer arm
Note
Action
Lay the internal harness in a natural state without
distortion.
1
Screws: Hex socket head cap
screw M4x10 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Refit the bracket.
Tip
Do not secure it with the screws before the cable
ferrule installed well.
2
Tightening torque: 2.4 Nm ±10%
xx2300000497
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
Screws: Hex socket head cap
screw M3x8 12.9 Lafre 2C2B/FC6.9
(2 pcs)
Secure the cable ferrule to the bracket with the
screws.
Tip
The air hoses should face the process hub side.
3
Tightening torque: 2.4 Nm ±10%
xx2300000496
Tip
The position with wrapped tape is the marked
position for the cable ferrule.
Tip
Align all the cable ferrules so that the cable is in
a natural bending position to avoid twisting.
Tip
Align all the cable ferrules so that the cable is in
a natural bending position to avoid twisting.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
Continues on next page
334
Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.6.5 Replacing the axis-3 timing belt
Continued
Содержание IRB 930
Страница 1: ...ROBOTICS Product manual IRB 930 ...
Страница 2: ...Trace back information Workspace 23B version a11 Checked in 2023 06 20 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 78: ...This page is intentionally left blank ...
Страница 600: ...This page is intentionally left blank ...
Страница 604: ......
Страница 605: ......