Refitting the SMB unit and battery unit
Use these procedures to refit the SMB unit and battery unit.
Refitting the SMB unit and battery unit
Note
Action
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
unit is sensitive to ESD on page 46
1
xx2100001035
Bind the SMB unit to the battery unit with the cable
strap.
2
Screws: Hex socket head cap
screw M3x5 12.9 Lafre 2C2B/FC6.9
(4 pcs)
Refit the SMB package to the SMB cover with the
screws.
3
Tightening torque: 0.8 Nm
xx2100001036
Route and secure the cabling with cable straps if
needed.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
4
Continues on next page
134
Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.3.2 Replacing the SMB unit and battery unit
Continued
Содержание IRB 930
Страница 1: ...ROBOTICS Product manual IRB 930 ...
Страница 2: ...Trace back information Workspace 23B version a11 Checked in 2023 06 20 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 78: ...This page is intentionally left blank ...
Страница 600: ...This page is intentionally left blank ...
Страница 604: ......
Страница 605: ......