Note
Action
Screws: Hex socket head cap
screw M6x20 12.9 Gleitmo
603+Geomet 500 (4 pcs)
Refit the motor and refit the timing belt to the
motor.
Ensure that the belt runs correctly in the grooves.
3
Washers: Spring washer, conical
11x5.3x1.2 Steel (4 pcs)
Refit the screws and washers without fully
tightened.
4
Tightening torque: 10 Nm ±10%
xx2300000512
Reconnecting the connectors for axis-1 motor
Note
Action
xx2300000505
Insert the female head of the connectors to the
bracket accordingly.
Tip
The mistake proofing measure has been applied
to the connectors, the connectors may be dam-
aged if excessive force is used.
Note
The harness are not visible due to the cleanness
requirements of the illustration. They are still ex-
isting inside the cable ferrule in the actual situ-
ation.
1
xx2300000504
Reconnect the connectors.
•
R2.MP1
•
R2.FB1
Tip
See the number markings on the connectors for
help to find the corresponding connector.
2
Continues on next page
432
Product manual - IRB 930
3HAC086009-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.7.1 Replacing the axis-1 motor sub-assembly
Continued
Содержание IRB 930
Страница 1: ...ROBOTICS Product manual IRB 930 ...
Страница 2: ...Trace back information Workspace 23B version a11 Checked in 2023 06 20 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 78: ...This page is intentionally left blank ...
Страница 600: ...This page is intentionally left blank ...
Страница 604: ......
Страница 605: ......