![ABB i-bus EIB Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/abb/i-bus-eib/i-bus-eib_product-manual_3371245013.webp)
ABB i-bus
®
EIB / KNX
Application and planning
ON/OFF delay
The ON/OFF delay causes the output to be switched on or off with a delay.
Output
Object “Switch”
„1“
T
D0
“0”
ON
OFF
T
D1
After a switching command, the delay period T
D1
or T
D0
starts. Once it has
elapsed, the output carries out the switching command.
Note:
If the device receives an OFF command during the ON delay
period T
D1
, the ON command is rejected.
Application: e.g. dynamic lightscene, in which luminaires are connected in
sequence
Flashing
The output can flash by switching on and off periodically.
Output
Object “Switch”
“1”
T
OFF
“0”
ON
OFF
T
ON
The ON time (T
ON
) and OFF time (T
OFF
) during the flashing can be
parameterised.
Note:
Please note that the maximum number of switching operations
is limited for the Switch Actuator Module SA/M 2.6.1. The
number of switching operations is unlimited for the Electronic
Switch Actuator Module.
3.2.2
Logic
With the “Logic” function, it is possible to link the switching of the output with
certain conditions. Two logic objects are available:
Output
Object “Logical
connection 1”
Object “Switch”
Object “Logical
connection 2”
Logic
operation
Logic
operation
First, the object “Switch” is evaluated together with the object “Logical
connection 1”. The result is linked with the object “Logical connection 2”.
The following logic functions are possible:
© 2004 ABB STOTZ-KONTAKT GmbH
13
Содержание i-bus EIB
Страница 62: ...ABB 2006 04 07 2004 ABB STOTZ KONTAKT GmbH 62 ...