
2.6 Water and air unit
2.6.1 Installation of Water and air unit
Overview
This section details how to install the Water and Air unit. The figures show IRB
6700, but the principle is the same for other robot types as well.
Location of the Water and Air unit
The Water and Air unit is located on top of the robot base, as shown in the figure.
xx1300002321
General technical data
The table below shows technical data of the water and air pressure:
Value
Parameter
Max. 0.6 MPa / 87 PSI
Water operating pressure
Max. 1.0 MPa / 145 PSI
Air operating pressure
Continues on next page
192
Product manual - DressPack/SpotPack IRB 6650S
3HAC055424-001 Revision: C
© Copyright 2004-2018 ABB. All rights reserved.
2 Installation
2.6.1 Installation of Water and air unit
Содержание DressPack IRB6650S
Страница 1: ...ROBOTICS Product manual DressPack SpotPack IRB 6650S ...
Страница 2: ...Trace back information Workspace R18 1 version a11 Checked in 2018 03 25 Skribenta version 5 2 025 ...
Страница 8: ...This page is intentionally left blank ...
Страница 40: ...This page is intentionally left blank ...
Страница 206: ...This page is intentionally left blank ...
Страница 228: ...This page is intentionally left blank ...
Страница 346: ...This page is intentionally left blank ...
Страница 358: ...This page is intentionally left blank ...
Страница 384: ...This page is intentionally left blank ...
Страница 386: ...This page is intentionally left blank ...
Страница 388: ......
Страница 389: ......