CONTENTS
1. Safety
2
-
4
1.1 Introduction
1.2 Symbols
1.3 Intended Use
1.4 Safety Instructions for Commissioning
1.5 Safety Instructions for Operation
1.6 Safety Instructions for Servicing
1.7 Safety Features
1.8 Caution Labeling Exemplify
2. Specifications
5
3. Packing, Transport and Storage
6
3.1 Lifting and handling
3.2 Storage and stacking of packages
3.3 Delivery and check of packages
4. Installation
7 - 18
4.1 Tools Required
4.2 Floor Requirement
4.3 Assembly View/Descriptions of Parts/Floor Plan
4.4 Foundation Dimensions / Specifications
4.4 Power Unit Location
4.5 Raising the Crossbeams
4.6 Powerside Runway Installation
4.7 Offside Runway Installation
4.8 Power Unit Installation
& Electrical Connections
4.9 Installing the Locking Device
4.1
0
Anchoring the Columns
4.1
1
Final Assembly
4.1
2
Leveling /
Synchronising
4.1
3
Bleeding
5. Operation
19 - 22
5.1
Preparation
5.2
Raising
5.3
Locking
5.4
Vehicle in Raised Position
5.5 Lowe
r
ing
5.6 Protection Against Unauthorised Usage
5.7 Safety Operating Procedures
5.8 Operation Instructions
6. Maintenance
23 - 28
6.1 Maintenance Schedule
6.2 Maintenance By the Operator
6.
3
Troubleshooting Guide
7. Explosion Diagrams and Parts List
29
-
3
4
7.1 Explosion Diagrams
7.2 Parts List
8
.
Warranty
3
5
1
Содержание AutoLift AL-10000T
Страница 13: ...12 ...
Страница 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Страница 31: ...气飞 30 ...
Страница 32: ...31 ...
Страница 33: ...4 3 32 ...
Страница 35: ...10 34 ...