4.11 Final Assembly
1.
Install the approach ramps on the entry side of the
hoist
.
2.
Install the front
wheel stops
at the forward side of the
hoist
using hex bolts, nuts and washers. Torque to 35-45 PSI.
4.12 Levelling / Synchronising
1.
Using an engineer’s automatic Level (transit), locate the Level, at a convenient location in the shop that allows an
unobstructed view of all four corners of the runways.
2.
Follow the Level manufacturer’s instructions for proper setup of the Level.
Be sure it is ADJUSTED LEVEL in all directions.
3.
Raise the
hoist
approximately
100mm
. Then lower
hoist
until all locking latches are engaged in each column and
the runways are in full down position on locks.
4.
Place a Level target on the right/front corner of the runway.
5
.
Beginning with “A” position, sight the level to the target and mark the number or the graduation on the inch
scale of the target that aligns to the cross hairs of the Level,
6
.
Next, move the target and place it at point “B” on the runway.
7
.
Rotate the Level and focus on the target scale.
8.
Adjust the adjustment nut on the safety ladder bar at the top of the Column at “B” until the cross hair of the Level
align to reference mark on the target scale.
Runway
Front
stop plate
Bolts (M14*85)
Approach
ramp
Stop Plate
Locking leaver assembly
17
Содержание AutoLift AL-10000T
Страница 13: ...12 ...
Страница 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Страница 31: ...气飞 30 ...
Страница 32: ...31 ...
Страница 33: ...4 3 32 ...
Страница 35: ...10 34 ...