9
.
Repeat steps locating the target assembly at points “C” and “D” and adjusting safety ladders at each
corresponding column until the reference mark on the target scale is on the cross hair of the Level.
The runways are now level at all four points. (See Fig. 1
2
.1)
10
.
To complete the leveling procedures,
TIGHTEN
EACH SAFETY LADDER TOP NUT against the bottom of the
Column Top Plate. Torque to 35-45 PSI.
11.
Raise the
hoist
to full height. Listen and watch as the locking latches click in place. SYNCHRONI
S
E BY ADJUSTING
THE CABLES so that all four latches click at the same time. Make necessary adjustments to the cables allowing
COMPENSATION FOR STRETCH.
4.13 Bleeding
1.
Hoist
must be fully lowered before changing or adding fluid.
2.
Raise and lower
hoist
six times. The cylinder is self-bleeding. After bleeding system, fluid level in power unit
reservoir may be down. Add more fluid if necessary to raise
hoist
to full height. It is only necessary to add fluid
to allow full height raise
.
3.
To pressure test, run
hoist
to full rise and run motor for approximately 3-seconds after
hoist
stops. This will place
pressure on the hydraulic system. Stop and check all fittings and hose connections. Tighten or reseal if required.
Engineer´s Level
(Transit)
Fig. 12.1
Safety locks may not click in at exactly the same time when vehicles are being raised. They should be
close. Be sure that all four corners have passed the SAME safety Ladder Bar slot before lowering
hoist
on
the safety locks. NEVER lower
hoist
on different safety lock position or damage to the
hoist
may result.
18
Содержание AutoLift AL-10000T
Страница 13: ...12 ...
Страница 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Страница 31: ...气飞 30 ...
Страница 32: ...31 ...
Страница 33: ...4 3 32 ...
Страница 35: ...10 34 ...