4.5 Column & Cross beam Installation
1. Place a chalk line on the floor according to the floor plan
layout. Pay attention to the power Unit location. Locate and
stand the columns at their respective locations.
DO NOT
BOLT
Columns down at this time. Use caution to prevent
the Columns from falling over. (See Fig. 4.1)
2. To estimate the shim requirements, place a target on
floor at each Column position and record the readings.
Find the highest of the four locations then find the
difference between each of the remaining Columns. This
difference is the estimated amount of shim thickness that
will be required at each Column. (See Fig. 4.2)
Note: The maximum shim thickness recommended by the
factory is no more than 12mm per Column using shims
and anchors provided with the hoist. A maximum shim
thickness of 50mm is possible by ordering optional shim
plates. Contact your authorised Advance AutoQuip
Distributor for ordering information.
3. Using a forklift or crane, raise the cross
beams
(making
sure the Plastic Slide Blocks are still in position) and drop
down into the top of the Columns. NOTE: The Sheave
Windows should be positioned inward and adjacent the
Power Unit Column. (See Fig. 4.3)
4. With the Columns standing and the cross
beams
in
position, install the Safety Ladders. Pass the Ladders
through the Column openings and drop down through the
Slide Block guide slots on the Cross
Beams
until the
Ladders
come to rest on the Base Plates. If bolting,
DO
NOT BOLT
Columns down at this time. (See Fig. 4.4 - 4.5)
Fig 4.5
Fig 4.4
Fig 4.2
Fig 4.3
Fig 4.1
9
Содержание AutoLift AL-10000T
Страница 13: ...12 ...
Страница 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Страница 31: ...气飞 30 ...
Страница 32: ...31 ...
Страница 33: ...4 3 32 ...
Страница 35: ...10 34 ...