1.
Feed the front locking lever handle through the power post crossbeam and connect the joining rod to the threaded
tube nuts and lock nuts.
2.
Feed the lock lever through the rear crossbeam and connect to the joining rod and lock nuts.
3.
Once the locking leaver has been installed and all lock nuts have been tightened, then you can install the rod ends to
the lever bracket.
(See Fig. 9.1)
.
Note: Check all lock nuts are
completely
tight prior to operation.
4.10 Anchoring the Columns.
Optional for the AL-10000T. See notes in section 4.4 Foundation Dimensions.
1.
Using the BASE PLATE on each column as a guide, drill each anchor hole
completely through the concrete
using a rotary
hammer drill and
20mm
concrete bit.. ( See Fig.
10.1
)
Drill hole
completely
through the
concrete
floor
.
Fig. 10.1
4.9
Installing the Locking Device
Fig. 9.1
15
Содержание AutoLift AL-10000T
Страница 13: ...12 ...
Страница 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Страница 31: ...气飞 30 ...
Страница 32: ...31 ...
Страница 33: ...4 3 32 ...
Страница 35: ...10 34 ...