3. Packing, transport and storage
3.1 Lifting and handling
When loading/unloading or transporting the equipment to the site, be sure to use suitable loading (e.g.
cranes,
trucks) and hoisting means. When you want to move the
hoist
, you need to install the traversing carriages on the
crossbeams and columns by using the special bolt. Dropping the
hoist
until the columns depart from the earth, you
can move the
hoist
. Be care no goods on the
hoist
through out the process.
Be sure also to hoist and transport the components securely so that they cannot drop, taking into consideration
the package’s size, weight and centre of gravity and it’s fragile parts.
3.2 Storage and stacking of packages
Packages must be stored in a covered place, out of direct sunlight and in low humidity, at a temperature
between -10°C and +40°C. Stacking is not recommended: the package’s narrow base, as well as its considerable
weight and size make it difficult and hazardous.
3.3 Delivery and check of packages
When the
hoist
is delivered, check for possible damages due to transport and storage;
verify that what is specified in the manufacturer’s confirmation of order is included. In case of damage in transit,
the customer must immediately inform the carrier of the problem.
Packages must be opened paying attention not to cause damage to people (keep a safe distance when opening straps)
and parts of the
hoist
.
6
Содержание AutoLift AL-10000T
Страница 13: ...12 ...
Страница 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Страница 31: ...气飞 30 ...
Страница 32: ...31 ...
Страница 33: ...4 3 32 ...
Страница 35: ...10 34 ...