2.
A
fter drilling, REMOVE DUST thoroughly from each hole using compressed air and/or bristle brush.
Make certain that the columns remain aligned with the chalk line.
3.
A
ssemble the washers and nuts on the anchors then tap into each hole with a hammer until the washer
rests against the base plate. Be sure that if shimming is required, enough THREADS ARE LEFT EXPOSED.
(See Fig.
10.2
)
4.
If shimming is required, insert the shims as necessary under the base plate so that when the anchor bolts
are tightened, the columns will be plumb. (See Fig.
10.3
)
5.
A
fter any necessary shims are installed, tighten each anchor nut to 125-150 ft. lbs. IMPORTANT - If a
anchor bolts do not hold when torqued to required amount, concrete must be replaced.
Saw cut and remove
600mm x 600mm
square area under each column base then repour with reinforced
3000
PSI concrete to a depth of six inches minimum, keying new concrete under existing floor.
(See Fig.
10.4
)
Tap anchor bolts into each
hole with a hammer until the
washer rests against the
baseplate.
Fig. 10.2
Anchor Bolts
Washer
Shims
Nut
Tighten each
anchor nut to
125-150ft. Ibs.
Fig. 10.3
Fig. 10.4
16
Содержание AutoLift AL-10000T
Страница 13: ...12 ...
Страница 30: ...曹营 7 Explosion Diagrams and Parts List 7 1 Explosion Diagrams 29 ...
Страница 31: ...气飞 30 ...
Страница 32: ...31 ...
Страница 33: ...4 3 32 ...
Страница 35: ...10 34 ...