Getting Started | 17
Aprisa SR+ User Manual 1.11.1
1.
Getting Started
This section is an overview of the steps required to commission an Aprisa SR+ radio network in the field:
Phase 1: Pre-installation
1.
Confirm path planning.
Page 74
2.
Ensure that the site preparation is complete:
•
Power requirements
•
Tower requirements
•
Environmental considerations, for example, temperature control
•
Mounting space
Page 77
Phase 2: Installing the radios
1.
Mount the radio.
Page 80
2.
Connect earthing to the radio.
Page 79
3.
Confirm that the:
•
Antenna is mounted and visually aligned
•
Feeder cable is connected to the antenna
•
Feeder connections are tightened to recommended level
•
Tower earthing is complete
4.
Install lightning protection.
Page 79
5.
Connect the coaxial jumper cable between the lightning protection and the radio
antenna port.
Page 84
6.
Connect the power to the radio.
Page 85
Содержание Aprisa SR+
Страница 1: ...January 2021 Version 1 11 1b ...
Страница 2: ......
Страница 10: ......
Страница 72: ......
Страница 86: ......
Страница 317: ...Managing the Radio 317 Aprisa SR User Manual 1 11 1 The Graph Current button presents a graph of current results ...