3DM Disk Management Utility
94
3ware Escalade ATA RAID Controller User Guide
the source disk. Uncorrectable blocks will be rewritten, but the data may be
incorrect. It is recommended that a file system check is executed when the
rebuild completes. By default, this function is disabled. Select this option only
if the initial rebuild has failed because of an ECC error on the source disk. The
reason that a rebuild failed is posted in the Alarms page of 3DM.
Scheduling background tasks
The
3DM Configuration
display allows routine maintenance of storage
media by scheduling array rebuilds, initialization, array verifications and
media scans. The background tasks selected are only performed during the
scheduled time. Depending on the schedule and system workload, back-
ground tasks may require more than one scheduled duration to complete. The
day of the week (or daily) time and duration to perform the selected back-
ground tasks can be specified using the pull-down menus. When finished, be
sure to click on the
Save Schedule
button to confirm the entries.
Background Task Features
Selecting the
Rebuild/Initialize
feature forces rebuilds and initialization to be
performed only during the time specified by the schedule. If this feature is not
selected, rebuilds and initialization can operate anytime they are required.
This feature affects only redundant arrays (RAID 1, 5 and 10).
The
Verify
feature verifies the redundancy of all RAID 1, 5 and 10 arrays.
The
Media Scan
feature continuously scans all drives (including hot-spares)
for media errors.
Note:
Rebuild/Initialize operations preempt Verify and Media Scan
operations. If a rebuild or initialization is required, it will be per-
formed before Verify and Media Scan during the scheduled win-
dow.
Tasks cannot be performed in time increments of less than one
hour. For example, if both Verify and Media Scan are selected and
the scheduled window is five hours, the verify operation is per-
formed during the first three hours and the media scan follows dur-
ing the remaining two hours.
Examples of Background Task Priorities
The following examples assume the scheduled duration is four hours.
■
Only Verify is selected: The verification operation is performed during the
scheduled window. If the operation completes with time remaining in the
window, the operation begins again on the same array (if there is only one
array) or continues on to additional redundant arrays. The verify opera-
tion stops when the duration in the scheduled window completes.
Содержание 3W-7410 - Escalade 7410 RAID Controller
Страница 6: ...iv 3ware Escalade ATA RAID Controller User Guide ...
Страница 14: ...Before You Begin 6 3ware Escalade ATA RAID Controller User Guide ...
Страница 22: ...Quick Installation Guide 14 3ware Escalade ATA RAID Controller User Guide Quick Installation Guide ...
Страница 24: ...Quick Installation Guide 16 3ware Escalade ATA RAID Controller User Guide ...
Страница 68: ...Windows Installation 60 3ware Escalade ATA RAID Controller User Guide ...
Страница 86: ...FreeBSD Installation 78 3ware Escalade ATA RAID Controller User Guide ...
Страница 104: ...3DM Disk Management Utility 96 3ware Escalade ATA RAID Controller User Guide ...
Страница 116: ...Troubleshooting Problems and Solutions 108 3ware Escalade ATA RAID Controller User Guide ...
Страница 122: ...Appendix B Warranty Technical Support and Service 114 3ware Escalade ATA RAID Controller User Guide ...
Страница 126: ...Index 118 3ware Escalade ATA RAID Controller User Guide ...