1-9
Figure 1-9
Configure stack ports on Switch B
z
In the
Port Settings
area, select the check boxes before
GigabitEthernet1/0/1
,
GigabitEthernet1/0/2
, and
GigabitEthernet1/0/3
.
z
Click
Enable
.
Now, switch B becomes a slave device.
# On Switch C, configure local port GigabitEthernet 1/0/1 connecting with Switch B as a stack port.
z
Select
IRF
from the navigation tree of Switch C to enter the page of the
Setup
tab, and then
perform the following configurations, as shown in .
Содержание 2928 - Baseline Plus Switch PWR
Страница 92: ...1 9 Figure 1 7 Display the rate settings of ports ...
Страница 105: ...1 4 Figure 1 3 Switch to the management level ...
Страница 106: ...i Table of Contents 1 Loopback Test Configuration 1 1 Overview 1 1 Loopback Operation 1 1 Configuration Guidelines 1 2 ...
Страница 109: ...i Table of Contents 1 VCT 1 1 Overview 1 1 Testing Cable Status 1 1 ...
Страница 114: ...1 2 Figure 1 2 Port traffic statistics ...
Страница 138: ...i Table of Contents 1 Energy Saving Configuration 1 1 Overview 1 1 Configuring Energy Saving on a Port 1 1 ...
Страница 159: ...i Table of Contents 1 Interface Statistics 1 1 Overview 1 1 Displaying Interface Statistics 1 1 ...
Страница 279: ...1 28 Figure 1 26 The Port Setup tab ...
Страница 331: ...i Table of Contents 1 Service Management 1 1 Overview 1 1 Configuring Service Management 1 2 ...