3-11
Copyright (c) 2004-2009 3Com Corp. and its licensors. All rights reserved.
3Com Baseline Switch 2928-PWR Plus uptime is 0 week, 0 day, 3 hours, 11 minutes
3Com Baseline Switch 2928-PWR Plus
128M bytes DRAM
128M bytes Nand Flash Memory
Config Register points to Nand Flash
Hardware Version is REV.B
CPLD Version is 001
Bootrom Version is 112
[SubSlot 0] 24GE+4SFP+POE Hardware Version is REV.B
upgrade
Syntax
upgrade
server-address
source-filename
{
bootrom
|
runtime
}
Parameters
server-address
: IP address or host name (a string of 1 to 20 characters) of a TFTP server.
source-filename
: Software package name on the TFTP server.
bootrom
: Specifies the Boot ROM file in the software package to be used at the next startup.
runtime
: Specifies the boot file in the software package to be used at the next startup.
Description
Use the
upgrade
server-address
source-filename
bootrom
command to upgrade the Boot ROM file. If
the Boot ROM file in the downloaded software package is not applicable, the original Boot ROM
program is still used at the next startup.
Use the
upgrade
server-address
source-filename
runtime
command to upgrade the boot file. If the
boot file in the downloaded software package is not applicable, the original boot file is still used at the
next startup.
To make the downloaded package take effect, you need to reboot the device.
The Switch 2900 series does not provide an independent Boot ROM file; instead, it integrates the Boot
ROM file with the boot file together in a software package with the extension name of
.bin
.
Examples
# Download software package
main.bin
from the TFTP server and use the Boot ROM file in the
package at the next startup.
<Sysname> upgrade 192.168.20.41 main.bin bootrom
Содержание 2928 - Baseline Plus Switch PWR
Страница 92: ...1 9 Figure 1 7 Display the rate settings of ports ...
Страница 105: ...1 4 Figure 1 3 Switch to the management level ...
Страница 106: ...i Table of Contents 1 Loopback Test Configuration 1 1 Overview 1 1 Loopback Operation 1 1 Configuration Guidelines 1 2 ...
Страница 109: ...i Table of Contents 1 VCT 1 1 Overview 1 1 Testing Cable Status 1 1 ...
Страница 114: ...1 2 Figure 1 2 Port traffic statistics ...
Страница 138: ...i Table of Contents 1 Energy Saving Configuration 1 1 Overview 1 1 Configuring Energy Saving on a Port 1 1 ...
Страница 159: ...i Table of Contents 1 Interface Statistics 1 1 Overview 1 1 Displaying Interface Statistics 1 1 ...
Страница 279: ...1 28 Figure 1 26 The Port Setup tab ...
Страница 331: ...i Table of Contents 1 Service Management 1 1 Overview 1 1 Configuring Service Management 1 2 ...