E1/T1 Cable Installation Requirements
Separately install E1/T1 cable for each single cabinet.
E1/T1 cable type, quantity, routing, length and installation position
must be according to engineering design drawings.
Before cable installation, ensure that are not damaged and all cables
have delivery logs and quality certificate to ensure product quality.
Use cable tie or wax cable bundle during cable installation. Keep cable
tie maximum length between two cables up to 39.37 inch (1000 mm).
Ensure cable ties are not too tight.
Use different cable strap according to circumstance, avoid using two or
more cable straps for bundling. Cut cable straps flat after bundling.
Figure 50 shows difference between correct and incorrect bundle.
F
I G U R E
5 0
-
C
A B L E
S
T R A P S
R
E Q U I R E M E N T S
Keep space between each two cable straps up to 3~4 times longer
than bundle diameter. Figure 51 shows this process.
F
I G U R E
5 1
-
C
A B L E
S
T R A P S
d
3d
~
4d
Summary of Contents for ZXC10 CBTS O1
Page 4: ...This page is intentionally blank ...
Page 10: ...This page is intentionally blank ...
Page 162: ......