ZXC10 CBTS I2 Installation Manual
46
Confidential and Proprietary Information of ZTE CORPORATION
ii.
Ensure cabinet base is at level and measure it by level ruler. Use
adjusting washer when required to level base.
iii.
Use wrench to fix adjustable base and cabinet tightly. Figure 25
shows adjustable base installation final view.
F
I G U R E
2 5
-
A
D J U S T A B L E
B
A S E I N S T A L L A T I O N
F
I N A L
V
I E W
7.
Insulation Test
Use multimeter to measure resistance between expansion bolts and
cabinet. Open circuit indicates proper insulation. If result is otherwise,
check insulation again and repeat the test.
8.
Cabinet fixing
Cabinet fixing is same as in direct installation mode.
Summary of Contents for ZXC10 CBTS O1
Page 4: ...This page is intentionally blank ...
Page 10: ...This page is intentionally blank ...
Page 162: ......