ZXC10 CBTS I2 Installation Manual
34
Confidential and Proprietary Information of ZTE CORPORATION
Direct Installation Mode Procedure
Take following steps for direct base installation mode:
1.
Hole Marking and Positioning
Use lineation model to determine position of cabinet base and draw
lines according to provided template. If template is not available
determine holes position according to engineering design drawings.
Figure 6 illustrates this process.
F
I G U R E
6
-
H
O L E S
P
O S I T I O N I N
D
I R E C T
I
N S T A L L A T I O N
M
O D E
( U
N I T S M M
)
2.
Drilling holes
For M12 expansion bolt, use
φ
10 drilling bit to drill 3.149 inch (80 mm)
deep hole. Use vacuum cleaner to clean dust meanwhile.
3.
Installing expansion bolts
Put tubes in drilled holes and hammer them and insert expansion bolts.
Fix bolt with nut and remove nut for cabinet installation. Figure 7
illustrates this process.
F
I G U R E
7
-
E
X P A N S I O N B O L T S
I
N S T A L L A T I O N
Summary of Contents for ZXC10 CBTS O1
Page 4: ...This page is intentionally blank ...
Page 10: ...This page is intentionally blank ...
Page 162: ......