ZXC10 CBTS I2 Installation Manual
132
Confidential and Proprietary Information of ZTE CORPORATION
Power Supply Inspection
Check following requirements before powering up a system.
Power supply range is according to engineering requirements.
AC and DC power supply cables are correctly installed.
PWS input and output power supply cables are connected correctly.
UPS cable is correctly installed and provides voltage in range of
-
43.2
V DC ~
-
56.5 V DC.
System grounding is provided.
Power supply switch is at OFF position.
All cables are according to specified labels.
Caution :
If anything goes wrong in any of below steps, shut down power supply
immediately, find fault and repeat the step again. Do not power on cabinet until
fault is removed.
Summary of Contents for ZXC10 CBTS O1
Page 4: ...This page is intentionally blank ...
Page 10: ...This page is intentionally blank ...
Page 162: ......