ZXC10 CBTS I2 Installation Manual
96
Confidential and Proprietary Information of ZTE CORPORATION
3.
Lay grounding cable up to the ground grid. Avoid bending and folding.
Adjust grounding cable according to installation specifications.
Figure 78 shows to improve sealing effect, wrap grounding cable at
grounding clip end with waterproof adhesive tape.
F
I G U R E
7 8
-
W
R A P P I N G
G
R O U N D I N G
C
A B L E
4.
Clamp the feeder external conductor with grounding cable copper
sheet and locking spring plate.
5.
Make joint of grounding clip and feeder waterproof using waterproof
adhesive tapes.
6.
Connect grounding end of the grounding clip to the main tower body.
Remove paint and oxide at connection place, to ensure good electric
contact.
7.
Connect grounding end of grounding clip to outdoor grounding bar,
before laying main feeder into the room.
Caution
:
Don’t install grounding clip in case of any lightning strike.
Routing Feeders
Feeder routing principles
Note down feeder actual route on paper to avoid rework.
Rout the feeder neatly without crossing the indoor cabling rack.
Rout the main feeder along the outdoor cabling rack and the
cabling rack on the tower with no crossing.
The minimum bending radius of the main feeder should not be less
than 20 times the radius of the main feeder. For one-time bending,
the minimum bending radius is 3.54 inch (90 mm). For multi-time
bending, the minimum bending radius is 7.87 inch (200 mm).
The maximum spacing between feeder clips is 64.96 inch (1.6 m).