ZXC10 CBTS I2 Installation Manual
48
Confidential and Proprietary Information of ZTE CORPORATION
Cabinet Accessories Installation
This section describes cabinet accessories installation.
Cabling Runway
Install cabling runway at cabinet top with four M4 X 10 bolts. Figure 27
shows cabling runway installation. Install converter on cabling runway with
four M3 X 12 bolts.
F
I G U R E
2 7
-
C
A B L I N G
R
U N W A Y
1. M3 X 12 bolt
2. Converter
3. Cabling tray/pipe 4. M4 x 10 bolt
Summary of Contents for ZXC10 CBTS O1
Page 4: ...This page is intentionally blank ...
Page 10: ...This page is intentionally blank ...
Page 162: ......