ZXC10-BTS (V5.4) Installation Manual
4-8
4.3.2.6
Installing the Baffle Plate at the Rack Bottom
After the rack is installed, fix the baffle plates on the four sides of the rack bottom.
When installing the baffle plates, install the plates on both sides first and then the plates
on the front and the rear, as shown in Fig. 4.3-5.
Front baffle
M5x16
combination screw
Side plate
Rear baffle
Fig. 4.3-5 Installing the Rack Baffle Plates
4.3.2.7
Insulation Test
Conduct the grounding test of the cabinet according to the requirements specified in
Section 2.1.5.
4.4 Connecting and Fixing Multiple Cabinets
This section describes the installation and fixation of multiple cabinets for the
multi-carrier BTS.
When two cabinets are required to be closely placed to each other and keep flush,
remove the cable hole cover plates on the cabinet side panels that contact with each
other for the purpose of cabling, as shown in Fig. 4.4-1.