Chapter
Error! Style not defined.
Err
or! Style not defined.
1-5
Survey Report
Project design documents
Environment
Acceptance Report
Cabling racks, power
supply system,
grounding system and
auxiliary facilities
Packing list
Check the goods
for consistency
Yes
No
Goods Error
Feedback Form
Goods Replacement
Application Form
Install the power
supply system
Install the cabinets
Install the
grounding system
Install the
internal cables
Install the
monitoring system
Install the main
antenna feeder system
Install the boards
Install the
GPS system
Hardware
installation check
End
Start
Install the
trunk cables
Project installation
preparation
Unpacking Inspection
Check the engineering
conditions
Fig. 1.2-1 Hardware Installation Flow