conduct the survey in time, he should entrust the equipment user to fill in the
report and mail it back after the survey for the preparation of engineering
materials.
The
BTS System Project Design and Engineering Drawing
should be completed
by the design party entrusted by the equipment user, and its copy should be
provided by the equipment user to the equipment supplier before equipment
delivery.
The
Environment Acceptance Report
is used for the first engineering
environment inspection during the project survey. If the environment is found to
fail the inspection, the equipment user is requested to make improvement and
solve the problem. The second environment inspection is conducted before the
engineering starts.
2.
ZXC10-BTSB I2 (V1.0) cdma2000 System Base Transceiver Station Installation
Manual
;
ZXC10-BTSB I2 (V1.0) cdma2000 System Base Transceiver Station
Technical Manual; ZXC10-BTSB I2 (V1.0) cdma2000 System Base Transceiver
Station Hardware Manual; ZXC10-BTSB I2 (V1.0) cdma2000 System Base
Transceiver Station Maintenance Manual.
3. Installation
Acceptance
Report and Test Acceptance Report.
The
Installation Acceptance Report
and
Test Acceptance Report
are the
engineering materials for acceptance after the BTS commissioning. They are
provided by the equipment supplier to the equipment user at the time of delivery.
They should be completed properly after the commissioning of the BTS.