178
/
218
Charging system layout diagram
1-Charging port (PKE) 2-Main fuse (25A) 3-Battery 4-Magnetic motor 5-Rectifier
Electrical schematic diagram
Letter
G
R
Y
Chinese green
Red
yellow
English
Green
Red
Yellow
Battery disassembly
1. Disassembly
Refer to the steps “a” to “d” in the section "Removing the
stepper motor and cleaning the carbon deposit" in the
section "Throttle valve body" in the "Maintenance" chapter
of this manual to remove the battery.
Caution:
●The whole vehicle must be powered off before
disassembling the battery.
●The negative pole must be removed first, and the
n the
positive pole. The opposite is true when installing.
●The positive and negative electrode protective caps must
be covered when reinstalling.
●After removing the battery, reset the meter time and reset
the EFI system.
Summary of Contents for ZT125-M 2022
Page 1: ...1 218 ZT125 310 350T M Maintenance Manual 2022 11 25...
Page 111: ...111 218 l So far the adjustment operation of the valve clearance is completed...
Page 138: ...138 218 Electrical schematic diagram of EFI system...
Page 182: ...182 218 Exploded view of front fork components M125 310 Directional exploded view...
Page 183: ...183 218 M350 Directional exploded view...
Page 185: ...185 218 M350...
Page 187: ...187 218 M350...