27
CHAPTER
INSTALLATION
ZIRKONZAHN – OPERATION AND MAINTENANCE MANUAL M1 MILLING UNIT COMPACT LINE – VERSION: 13/05/2021
TRANSPORT AND UNPACKING
- Check if the supply corresponds to the delivery note.
- Check the delivery for completeness and integrity immediately after receipt.
- Evident defects must be noted on the delivery documents, in order to claim for compensation
against the transport company.
- In case of complaints, have the transport documents countersigned by the carrier and send a
copy to Zirkonzahn ([email protected]).
- Follow the safety regulations for moving loads.
- Transport weight is indicated on the type plate or in the technical data sheet.
- The milling unit is supplied on a pallet and encased by a cardboard box.
- Do not put any other object on top of the cardboard box.
- A forklift or a lift tray truck (> 350 kg) is recommended for the transport of the pallet. Be
careful when lifting!
- Wear safety shoes and safety gloves when transporting and setting up the milling unit.
- Caution when removing the cardboard casing (glass casing).
- Caution when unpacking and setting up the milling unit: risk of injury.
- Due to the high dead weight of the milling unit, several people are required for positioning it.
- The original packaging must be kept for at least 1 year for possible return consignments.
- For the operation of the device, a suitable power supply, compressed air supply and suction unit
(see technical data sheet) are required.
INSTALLATION