![Zip Commercial HydroTap 86682 Installation And Operating Instructions Manual Download Page 10](http://html1.mh-extra.com/html/zip/commercial-hydrotap-86682/commercial-hydrotap-86682_installation-and-operating-instructions-manual_3816701010.webp)
Page 10 of 20
Hydro Tap Installation and Operating Instructions - 86682 - March 2012 v1.05
Step E - Connecting the water supply
To prevent sediment from entering the Zip HydroTap at connection, flush
water through the supply line thoroughly before connection to the Zip
HydroTap. Open the access door and check that the filter is in place and
secure. Connect the water supply to the undersink unit using the attached
flexible hose .Turn on water and check for leaks. If no leaks are evident turn
the power on.
Step F - Testing and commissioning
Filter Flush Mode
The display screen will show which model you have.
Have a bucket or similar container (not supplied) at the ready to hold a
quantity of water that is ejected while the Filter Flush Mode is in operation.
Open the filter access door on the front of the HydroTap and the filter
cartridge will be exposed. Located to the rear RHS of the cartridge is a fixed
flush line, approx 600mm long and the flush line stop cock. Place the free end
of the flush line into the bucket or container (not supplied).
Turn ON both water and electricity supplies and open the flush line stop cock.
The display will show Filter Flush Mode. To activate press adjust
>
and run
at least 7.5 Ltrs of water through to activate the filter membrane. Press the
adjust
>
button again to stop the Filter Flush Mode. Turn OFF the Filter Flush
stop cock and re-locate the tube and stop cock in the filter compartment.
Turning OFF the Filter Flush Mode puts the HydroTap into calibration mode.
Press adjust
>
to start calibration. The element will now cycle ON and heat
the water to 90ºC maintaining it at that temperature for a short stabilisation
period.
Once stabilised, the element will cycle On, bring the water to boiling point and
hold it there for a short period.
Calibration
The unit now carries out a self calibration function to ensure correct
temperatures are maintained. During this period the Red LED on the Tap Head
assembly flashes slowly until the calibration function is complete.
Note: It is normal for steam to be released from the tap during the calibration
process. Take caution to ensure no scalding occurs.
Once this step is complete (approx 5 minutes) the unit will default to normal
operation.
When starting, both Boiling and Chilled cycles activate simultaneously after
calibration has taken place, the following descriptions indicate what happens
during each cycle.
Installation Procedure
continued
Boiling Water Lever
Chilled Water Lever
Red Light White Light Blue Light
Boiling Filter Status Chilled
Use these buttons to
scroll through the menu
Use these buttons to
activate and de-activate
the program selected
NOTE :
New hose sets supplied with the
unit should be used. Do not use
old hose sets.