Installation and operating instructions
19
5.3 Overview of the connection area
Object
Description
A
DC-switch (optional): switch on or off for PV-load
B
DC input A: plug-in connectors to connect the PV array A
C
DC input B: plug-in connectors to connect the PV array B
D
Earthing terminal: connect a second protective earthing conductor
E
USB (HMI) interface: update or burn the HMI firmware
F
AC output: plug-in connector to connect the grid.
G
RJ45 interface: connect the monitoring device
H
USB (MCU) interface: update or burn the MCU firmware
Summary of Contents for Eversol-TLC 10K
Page 1: ......