Written by:.JBJ
Checked by: AC
Document Number: Premier MX Inst Rev: 2
Page 20 of 44
14/12/06
Figure 13– Repeater connection diagram
Repeater
A
B
GN
D
TB20
TB21
[Top right hand corner of motherboard]
Repeater
A
B
GN
D
TB20
TB21
Data Cable Screen
Precept en fire detection/alarm panel
Precept en repeater panel [max 5 off]
Power Supply connections not shown.
[Top right hand corner of motherboard]
EARTH BAR
Through connector, insulated
from panel earth
Connect the repeater mains power supply (if required) to the L, N and E terminals as
described above for the panel.
13.
Commissioning
13.1
Introduction
The following equipment should be available where possible to minimise
commissioning time:
i) VHF/UHF Portable Radio (for two engineers)
ii) Multi-meter or equivalent
13.2
Commissioning Checklist
1. Before commissioning, the engineer should check the following:
i) All field wiring has been inspected and tested in accordance with CEL
wiring recommendations, current issues of BS5839:1 and BS7671 IEE
wiring regulations.
ii) All field cables are glanded into the control panel cabinet.
iii) Detector bases are terminated but detector heads are not fitted. Any devices
with electronic components are not fitted. Terminations to devices with
electronic components should be linked through to maintain cable
continuity.
iv) Manual Call Points are not connected but cable is linked through to maintain
continuity.