© 2013/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0329-001 Rev F
File Generated July 3, 2013
Page 38
ZS SPAN INSTALLATION MANUAL FOR RAIL-BASED APPLICATIONS - U.S.
Ground Prep, Continued
Slide Spanner Clamps onto Spanner
Bars. All Spanner Clamps should face
the same way.
Spanner Bar Staging
3d
Stage the Cam Feet between
Spanner Clamps, just past where
module edge will fall.
Top Mount Tile
Hook
Side Mount Tile
Hook
East-West drop-in
North-South drop-in
Top Mount or Side
Mount Tile Hook
Spanner Clamp Position Matches Tile Hook Type
Use Correct Tile Hook Type for Spanner Bar Direction
3e
3f
Top Mount Tile
Hook only
Module positioning
First-row Cam Feet Rockits
should be positioned half-
way up the threaded stud.